discharge of fill material
The addition of fill material into waters of the U.S. The term generally includes, without limitation, the following activities: placement of fill that is necessary for the construction of any structure in a water of the U.S.; the building of any structure or impoundment requiring rock, sand, dirt, or other material for its construction; site-development fills for recreational, industrial, commercial, residential, and other uses; causeways or road fills; dams and dikes; artificial islands; property protection and/or reclamation devices such as riprap, groins, seawalls, breakwaters, and revetments; beach nourishment; levees; fill for structures such as sewage treatment facilities, intake and outfall pipes associated with power plants and subaqueous utility lines; and artificial reefs. The term does not include plowing, cultivating, seeding, and harvesting for the production of food, fiber, and forest products. Selected discharge of fill material links:
© 1997-2006 Healthboard.com.
Healthboard.com is a purely
informational website, and should not be used as a substitute
for professional legal, medical or technical advice. |
|